Spartan Motor Factors

110 vans deployed in 4 weeks, without downtime or disruption

When Spartan Motor Factors needed to scale their fleet quickly, the priority was clear: get vehicles on the road fast, without slowing the business down.

By bringing vehicle supply, branding, and telematics into one coordinated workflow, the entire fleet was delivered ready for work, with no unnecessary delays.

    The Goal

    Deploy over 110 citreon Berlingo vans within a tight timeframe, without disrupting day-to-day operations.

    This wasn’t just about branding vehicles — it was about maintaining momentum across the business while rolling out a fleet at scale.

      The Challenge

      Fleet rollouts at this scale are typically slow and fragmented.

      Vehicles move between multiple locations. Branding is applied inconsistently. Installations are staggered. And vehicles sit idle between each stage.

      That approach creates delays, increases costs, and puts pressure on operations.

        The Solution & Outcome

        The entire rollout was centralised into a single location, allowing every vehicle to move through each stage without delay.

        Brandfixx applied modular graphics designed for speed and consistency, ensuring every vehicle met the same standard across the fleet.

        By aligning vehicle preparation, branding, and telematics into one workflow, the process remained efficient from start to finish — with no vehicles sitting idle and no delays between stages.

        All 110 vehicles were delivered fully branded, equipped, and ready for immediate use.

        Key Stats

        110 vehicles prepared, branded and deployed

        Full fleet branded using modular kits

        Nationwide rollout completed in just 4 weeks

        Zero vehicle downtime during deployment

        Address

        Unit F1, Rotterdam Park,
        Hull, HU7 0AN

        Interested?

        Get a Quote.

        Click below & we'll be in touch

        Get a quote